Completion of Kalna Bridge Project
This project was awarded in 2018 to LISEMCO LILAMA, it consists of the following phase of constructions: submission of engineering drawings, production of nesting plans, procurement of materials, fabrication of girders, crossbeams, stringers, arch ribs, strut bracings, trial assembly of arch ribs and girders, trial fit inspection, dis-assembly of bridge structure, blasting/painting, packing for transportation. IBS acquired LISEMCO during the fabrication phase and IBS LISEMCO continued the project and successfully delivered two shipments of the bridge girders and arch ribs blocks on schedule.